(1) The
department of transportation may use the design-build procedure
for public works projects over ten million dollars where:
(a) The construction activities are highly specialized and a
design-build approach is critical in developing the construction
methodology; or
(b) The projects selected provide opportunity for greater
innovation and efficiencies between the designer and the builder;
or
(c) Significant savings in project delivery time would be
realized.
(2) To test the applicability of the design-build procedure
on smaller projects and specialty projects, the department may
conduct up to five pilot projects on projects that cost between
two and ten million dollars. The department shall evaluate these
pilot projects with respect to cost, time to complete,
efficiencies gained, if any, and other pertinent information to
facilitate analysis regarding the further use of the design-build
process on projects of this size.
[2006 c 37 § 1; 2001 c 226 § 3.]