WAC 173-157-130
What must I include in the project
operation plan? Your project operation plan should include,
at a minimum, the following information:
(1) The quantity and times of year source water is
available for recharge.
(2) The proposed rate of injection and withdrawal of
water.
(3) The length of time the water is proposed to be
stored.
(4) The location, number, and capacity of proposed
recharge wells or infiltration basins, and recovery
facilities.
(5) Any variability in quality and reliability of the
source water.
(6) A description of any water treatment method(s) you
will use at the time of injection and recovery to ensure
compliance with the water quality standards set forth in
chapter 173-200 WAC, as well as the department's
antidegradation policy.
(7) Any plans to discharge ASR water to a surface body
should include information on the quantity, timing, duration,
and water quality parameters such as chlorine, pH and
dissolved oxygen of the ASR discharge water.
(8) Any operation and maintenance plans to discharge
ground water and suspended sediment from the ASR well shall
provide information on the quantity, duration, quality, and
means of discharge.
(9) Destination(s) and permitting for water used for
operation and maintenance (e.g., flushing water).
[Statutory Authority: RCW 90.03.370 (2)(b) and 90.44.460. 03-03-081 (Order 02-06), § 173-157-130, filed 1/15/03,