WAC 173-157-170
What must I include in the project
monitoring plan? Your project monitoring plan, which will be
utilized to evaluate and verify the assumptions in the
conceptual model, during the pilot and operational phases,
must include the following:
(1) Proposed time intervals for sampling and subsequent
reporting.
(2) Descriptions of measurement methodology, threshold
values, and evaluation techniques for the following criteria:
(a) The quality of the source and receiving waters. This
information must be provided for the period or periods of the
year when the water will be stored. Testing must be done by a
laboratory certified by either the department or DOH.
(b) The actual quantity of water injected.
(c) Changes in ground water piezometric elevations in the
receiving aquifer.
(d) The percentage of the initial amount of stored water
that is recoverable after varying lengths of storage time to
validate the estimates of the amount of stored water that is
actually recovered.
(e) Data necessary to evaluate the effectiveness of
required mitigation.
(f) Other data you or the department determine necessary
for monitoring the ASR project and adverse impacts.
You must provide a report of the monitoring data, at
least annually, to the department. Based on the complexity of
the project, the department may require you to comply with a
more frequent reporting schedule. The required reporting
frequency will be specified in the reservoir permit.
[Statutory Authority: RCW 90.03.370 (2)(b) and 90.44.460. 03-03-081 (Order 02-06), § 173-157-170, filed 1/15/03,