WAC 173-173-160
Under what conditions is the use of power
consumption data acceptable to the department? (1) Use of power
consumption data may be substituted for more direct flow
measurement methods, provided:
(a) Use of the method is approved in writing by the
department;
(b) Installation of a water meter would be unduly burdensome
to the water user;
(c) The water system maintains a constant or near constant
pumping or diversion rate;
(d) The power meter is dedicated to one diversion or
withdrawal;
(e) A pump test is conducted for a minimum duration of two
hours and is conducted under normal operating conditions;
(f) The diversion or withdrawal is not a flowing artesian
well.
(2) The equation below shall be used when relying upon
electrical power consumption to estimate volume or flow rate.
This equation also may be used to estimate flow during short
periods of meter repair or maintenance if the department finds
that reasonable estimates of pump and motor efficiency are
available:
| |
318,600(kWh)(Peff)(Meff) |
| V = |
|
| |
TDH |
Where: V = volume of water pumped in gallons;
318,600 = conversion factor;
kWh = number of kilowatt-hours for the time period in
question; e.g., irrigation season, year or minutes;
Peff = pump efficiency as a decimal;
Meff = motor efficiency as a decimal; and
TDH = total dynamic head of the system in feet.
[Statutory Authority: RCW 90.03.360, 90.44.050, [90.44.]250,[90.44.]450
and chapter 43.21A RCW. 02-02-017 (Order 00-01), §
173-173-160, filed 12/21/01, effective 1/21/02.]