WAC 173-182-310
Planning standards. (1) Ecology shall
apply a planning standard when determining the ability of a
plan holder to meet the purposes of these regulations. Each
planning standard is subject to being verified at scheduled or
unannounced drills. In an actual spill event, initial
deployment shall be guided by safety considerations. The
responsible party must address the entire volume of an actual
spill regardless of the planning standards.
(2) The planning standards described in this chapter do
not constitute cleanup standards that must be met by the
holder of a contingency plan. Failure to remove a discharge
within the time periods set out in this section does not
constitute failure to comply with a contingency plan for
purposes of this section or for the purpose of imposing
administrative, civil, or criminal penalties under any other
law.
[Statutory Authority: Chapters 88.46, 90.56, and 90.48 RCW. 06-20-035 (Order 00-03), § 173-182-310, filed 9/25/06,
effective 10/26/06.]