WAC 173-401-615
Monitoring and related recordkeeping and
reporting requirements. (1) Monitoring. Each permit shall
contain the following requirements with respect to monitoring:
(a) All emissions monitoring and analysis procedures or
test methods required under the applicable requirements,
including any procedures and methods promulgated pursuant to
sections 504(b) or 114 (a)(3) of the FCAA;
(b) Where the applicable requirement does not require
periodic testing or instrumental or noninstrumental monitoring
(which may consist of recordkeeping designed to serve as
monitoring), periodic monitoring sufficient to yield reliable
data from the relevant time period that are representative of
the source's compliance with the permit, as reported pursuant
to subsection (3) of this section. Such monitoring
requirements shall assure use of terms, test methods, units,
averaging periods, and other statistical conventions
consistent with the applicable requirement. Recordkeeping
provisions may be sufficient to meet the requirements of this
paragraph; and
(c) As necessary, requirements concerning the use,
maintenance, and, where appropriate, installation of
monitoring equipment or methods.
(2) Recordkeeping. With respect to recordkeeping, the
permit shall incorporate all applicable recordkeeping
requirements and require, where applicable, the following:
(a) Records of required monitoring information that
include the following:
(i) The date, place as defined in the permit, and time of
sampling or measurements;
(ii) The date(s) analyses were performed;
(iii) The company or entity that performed the analyses;
(iv) The analytical techniques or methods used;
(v) The results of such analyses; and
(vi) The operating conditions existing at the time of
sampling or measurement;
(b) A record describing changes made at the source that
result in emissions of a regulated air pollutant subject to an
applicable requirement, but not otherwise regulated under the
permit, and the emissions resulting from those changes.
(c) Retention of records of all required monitoring data
and support information for a period of five years from the
date of the monitoring sample, measurement, report, or
application. Support information includes all calibration and
maintenance records and all original strip-chart recordings
for continuous monitoring instrumentation, and copies of all
reports required by the permit.
(3) Reporting. With respect to reporting, the permit
shall incorporate all applicable reporting requirements and
require the following:
(a) Submittal of reports of any required monitoring at
least once every six months. All instances of deviations from
permit requirements must be clearly identified in such
reports. All required reports must be certified by a
responsible official consistent with WAC 173-401-520.
(b) Prompt reporting of deviations from permit
requirements, including those attributable to upset conditions
as defined in the permit, the probable cause of such
deviations, and any corrective actions or preventive measures
taken. The permitting authority shall define "prompt" in each
individual permit in relation to the degree and type of
deviation likely to occur and the applicable requirement. For
deviations which represent a potential threat to human health
or safety, "prompt" means as soon as possible, but in no case
later than twelve hours after the deviation is discovered. The source shall maintain a contemporaneous record of all
deviations. Other deviations shall be reported no later than
thirty days after the end of the month during which the
deviation is discovered.
(4) Compliance assurance monitoring. 40 CFR Part 64, in
effect on July 1, 2000, is adopted by reference.
[Statutory Authority: RCW 70.94.161(2). 02-19-078 (Order
02-02), § 173-401-615, filed 9/16/02, effective 10/17/02. Statutory Authority: Chapter 70.94 RCW, RCW 70.94.141,[70.94.]152
, [70.94.]331, [70.94.]510 and 43.21A.080. 01-17-062 (Order 99-06), § 173-401-615, filed 8/15/01,
effective 9/15/01. Statutory Authority: Chapter 70.94 RCW. 93-20-075 (Order 91-68), § 173-401-615, filed 10/4/93,
effective 11/4/93.]