WAC 173-401-820
Review by affected states. (1) Notice. The permitting authority shall give notice of each draft
permit, permit revision, or permit renewal to any affected
state on or before the time that the permitting authority
provides this or permit revision notice to the public under
WAC 173-401-800 and 173-401-805, except to the extent WAC 173-401-725 (2) or (3) requires the timing of the notice to be
different.
(2) Response. The permitting authority, as part of the
submittal of the proposed permit to the administrator (or as soon as possible after the submittal for minor permit
modification procedures allowed under WAC 173-401-725 (2) and
(3), shall notify the administrator and any affected state in
writing of any refusal by the permitting authority to accept
all recommendations for the proposed permit that the affected
state submitted during the public or affected state review
period. The notice shall include the permitting authority's
reasons for not accepting any such recommendation. The
permitting authority is not required to accept recommendations
that are not based on applicable requirements or the
requirements of this chapter.
(3) British Columbia notification. The permitting
authority shall notify British Columbia of draft permits,
permit revisions, or permit renewals at sources located within
100 kilometers of the Washington-British Columbia border. Such notice shall be concurrent with notification of EPA and
affected states.
[Statutory Authority: Chapter 70.94 RCW. 93-20-075 (Order
91-68), § 173-401-820, filed 10/4/93, effective 11/4/93.]