WAC 296-104-020
Administration -- What are the filing
requirements for boilers and unfired pressure vessels before
their installation/reinstallation? A "boiler and pressure
vessel installation/reinstallation permit," as defined in WAC 296-104-010 shall be submitted by the owner or agent and
approved by the chief inspector.
[Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150,
70.79.290, 70.79.330, 70.79.350, and chapter 70.79 RCW. 02-23-036, § 296-104-020, filed 11/13/02, effective 12/14/02;
01-24-061, § 296-104-020, filed 11/30/01, effective 12/31/01. Statutory Authority: RCW 70.79.030 and 70.79.040. 99-22-026,
§ 296-104-020, filed 10/26/99, effective 11/26/99; 95-19-058,
§ 296-104-020, filed 9/15/95, effective 10/16/95; Order 74-37,
§ 296-104-020, filed 11/8/74; Part II, § 1, filed 3/23/60.]