| 296-150V-0010 |
Authority, purpose, and scope. |
| 296-150V-0020 |
What definitions apply to this chapter? |
| 296-150V-0030 |
How is this chapter enforced? |
| 296-150V-0040 |
Is manufacturing information kept confidential? |
| 296-150V-0050 |
Can you prohibit the sale or lease of a conversion vendor unit or medical unit? |
| 296-150V-0060 |
Who handles consumer complaints about conversion vendor units or medical units? |
| 296-150V-0070 |
Do you have reciprocal agreements with other states to inspect conversion vendor units and medical units? |
| 296-150V-0080 |
Do you allow a local enforcement agency to inspect conversion vendor units and medical units at the
manufacturing location? |
| 296-150V-0100 |
What happens if I disagree with your decision regarding my compliance with this chapter? |
| 296-150V-0110 |
Do you have an advisory board to address conversion vendor unit and medical unit issues? |
| 296-150V-0120 |
Where can I obtain technical assistance regarding conversion vendor units or medical units? |
| 296-150V-0140 |
Do you allow the use of alternate materials, design, or method of construction? |
| 296-150V-0200 |
Who must obtain conversion vendor unit or medical unit insignia? |
| 296-150V-0205 |
Can I obtain an exempt vendor/medical insignia? |
| 296-150V-0210 |
What are the insignia requirements? |
| 296-150V-0220 |
How do I obtain insignia information and the required forms? |
| 296-150V-0230 |
What are the insignia application requirements? |
| 296-150V-0240 |
What documentation do you need to perform an alteration inspection? |
| 296-150V-0250 |
How do I replace lost or damaged insignia? |
| 296-150V-0300 |
When is design-plan approval required? |
| 296-150V-0310 |
Who can approve design plans? |
| 296-150V-0320 |
What must I provide with my request for conversion vendor unit or medical unit design-plan approval by the
department? |
| 296-150V-0340 |
When is an engineering analysis or structural load test for design plans required? |
| 296-150V-0350 |
What must test procedures and results for design plans include? |
| 296-150V-0380 |
What happens if you approve my design plan? |
| 296-150V-0390 |
If my design plan is not approved, how much time do I have to submit a corrected design plan? |
| 296-150V-0400 |
What happens after my design plan is approved? |
| 296-150V-0410 |
When does my design plan expire? |
| 296-150V-0415 |
Who approves addendums to design plans? |
| 296-150V-0500 |
When is an inspection required? |
| 296-150V-0510 |
How do I request an inspection? |
| 296-150V-0520 |
What happens if my conversion vendor unit or medical unit passes inspection? |
| 296-150V-0530 |
Am I charged if I request an inspection but I am not prepared? |
| 296-150V-0540 |
Who inspects a conversion vendor unit or medical unit installation at the building site or event location? |
| 296-150V-0550 |
Do you allow a conversion vendor unit or medical unit to be completed at the installation site? |
| 296-150V-0560 |
What happens if I receive a notice of noncompliance after inspection of the alteration to my conversion
vendor unit or medical unit? |
| 296-150V-0580 |
Must I obtain an insignia for used conversion vendor units or medical units? |
| 296-150V-0590 |
How do I obtain insignia for used conversion vendor units or medical units? |
| 296-150V-0700 |
Must manufacturers of conversion vendor units and medical units notify you if they manufacture at more than
one location? |
| 296-150V-0710 |
Must manufacturers of conversion vendor units and medical units notify you of a change in business name or
address? |
| 296-150V-0720 |
Must manufacturers of conversion vendor units and medical units notify you of a change in business ownership? |
| 296-150V-0800 |
What codes apply to conversion vendor units or medical units? |
| 296-150V-0930 |
When are structural load tests or structural calculations required? |
| 296-150V-0950 |
What requirements apply to roof coverings? |
| 296-150V-1040 |
Are there floor requirements? |
| 296-150V-1070 |
What requirements apply to floor closure material? |
| 296-150V-1090 |
What are the standards for equipment and installations? |
| 296-150V-1100 |
What are the flame-spread limitations? |
| 296-150V-1110 |
Combustible limitations. |
| 296-150V-1120 |
What are the standards for wall and cabinet protection? |
| 296-150V-1170 |
What are the light and ventilation requirements? |
| 296-150V-1180 |
What requirements apply to conversion vendor unit exits on all units approved after December 31, 1999? |
| 296-150V-1185 |
What exit door requirements apply to self-propelled medical unit exits? |
| 296-150V-1190 |
Interior privacy locks. |
| 296-150V-1303 |
How must storage batteries be installed in a conversion vendor unit or medical unit? |
| 296-150V-1330 |
What are the mechanical requirements for a conversion vendor unit or medical unit? |
| 296-150V-1350 |
What are the LPG system enclosure and mounting requirements for a conversion vendor unit or medical unit? |
| 296-150V-1360 |
What are the fuel gas piping design requirements for a conversion vendor unit or medical unit? |
| 296-150V-1380 |
Can gas tubing be concealed in a conversion vendor unit or medical unit? |
| 296-150V-1390 |
What are the pipe-joint compound requirements for gas piping in a conversion vendor unit or medical unit? |
| 296-150V-1400 |
What are the gas piping hanger and support requirements for a conversion vendor unit or medical unit? |
| 296-150V-1410 |
What are the electrical bonding requirements for gas piping in a conversion vendor unit or medical unit? |
| 296-150V-1420 |
How are gas supply connections in a conversion vendor unit or medical unit identified? |
| 296-150V-1430 |
What requirements apply to gas piping system openings? |
| 296-150V-1440 |
Are gas piping shut-off valves required in a conversion vendor unit or medical unit? |
| 296-150V-1450 |
What requirements apply to testing for gas piping leaks before conversion vendor unit or medical unit
appliances are connected? |
| 296-150V-1460 |
What requirements apply to testing for gas piping leaks after conversion vendor unit or medical unit appliances
are connected? |
| 296-150V-1470 |
What are the requirements for appliance installations? |
| 296-150V-1530 |
What general plumbing requirements apply? |
| 296-150V-1540 |
What are the plumbing definitions? |
| 296-150V-1550 |
What requirements apply to drain outlets? |
| 296-150V-1560 |
What is the minimum clearance for drain outlets? |
| 296-150V-1570 |
What requirements apply to water-supply connections? |
| 296-150V-1580 |
What requirements apply to water heater relief valves and safety devices? |
| 296-150V-1590 |
What requirements apply to waste holding tanks for conversion vendor units? |
| 296-150V-1600 |
What are the requirements associated with medical and conversion vending units that have been manufactured
and used outside the state according to RCW 43.22.380? |
| 296-150V-3000 |
Conversion vendor units and medical units--Fees. |