WAC 480-75-430
Welding procedures. (1) Each pipeline
company must use welding procedures specified in the API
Standard 1104 or Section IX of the ASME Boiler and Pressure
Vessel Code and each pipeline company must qualify its welders
according to these standards. Information about these
standards, and where to obtain them, are set out in WAC 480-75-999, Adoption by reference. Each welder qualification
test result must be recorded and kept for a period of five
years, and:
(a) To qualify or requalify a welder or to qualify a
welding procedure, each pipeline company must use testing
equipment capable of measuring the essential variables used
during the test. Each pipeline company must record all
essential variables performed during the qualification or
requalification.
(b) Each pipeline company must have the appropriate
written qualified welding procedures at the site where the
welding is being performed.
(2) Each welder used by a pipeline company must carry
appropriate identification and qualification cards showing the
name of welder, qualifications, the date qualification
expires, and the name of the pipeline company whose procedures
the welder used for the qualification. Each welder's
identification and qualification card will be subject to
commission inspection at all times when a welder is working on
a facility subject to the commission's pipeline safety
jurisdiction.
[Statutory Authority: RCW 80.01.040, 80.04.060, 81.88.040. 08-12-045 (Docket PL-070974, General Order R-548), §
480-75-430, filed 5/30/08, effective 6/30/08. Statutory
Authority: RCW 80.01.040 and 80.04.160. 02-18-032 and
02-20-015 (Docket No. TO-000712, General Order No. R-500 and
R-502), § 480-75-430, filed 8/26/02 and 9/20/02, effective
9/26/02 and 10/21/02.]