WAC 480-75-660
Procedural manual for operations,
maintenance, and emergencies. (1) Each pipeline company must
prepare and follow a procedural manual that includes the
following:
(a) Procedures required in 49 CFR Section 195.402;
(b) Procedures for responding to earthquakes, including a
threshold for line shutoff, and procedures for integrity
monitoring prior to restart; and
(c) Procedure for assessing the potential for impacts on
the pipeline system due to landslides. Pipeline companies
with facilities located within potential landslide areas must
develop monitoring and remediation procedures for ensuring
that pipeline integrity is maintained in these areas.
(2) Each pipeline company shall submit a copy of its
current procedural manual to the commission and must submit
any revisions to the procedural manual to the commission
within thirty days of the procedural manual change. A new
pipeline company must submit its procedural manual no later
than sixty days prior to startup.
[Statutory Authority: RCW 80.01.040, 80.04.060, 81.88.040. 08-12-045 (Docket PL-070974, General Order R-548), §
480-75-660, filed 5/30/08, effective 6/30/08. Statutory
Authority: RCW 80.01.040 and 80.04.160. 02-18-032 (Docket
No. TO-000712, General Order No. R-500), § 480-75-660, filed
8/26/02, effective 9/26/02.]