WAC 480-107-115
System emergencies. (1) A generating
facility entering into a power contract under these rules is
required to provide energy or capacity to a utility during a
system emergency only to the extent:
(a) Provided by agreement between such generating
facility and utility; or
(b) Ordered under section 202(c) of the Federal Power
Act.
(2) During any system emergency, a utility may
discontinue or curtail:
(a) Purchases from a generating facility if such
purchases would contribute to such emergency; and
(b) Sales to a generating facility, if such
discontinuance or curtailment:
(i) Does not discriminate against a generating facility;
and (ii) Takes into account the degree to which
purchases from the generating facility would offset the need
to discontinue or curtail sales to the generating facility.
(3) System emergencies resulting in utility action under
this chapter are subject to verification by the commission
upon request by either party to the power contract.
[Statutory Authority: RCW 80.01.040 and 80.04.160. 06-08-025
(Docket No. UE-030423, General Order No. R-530), §
480-107-115, filed 3/28/06, effective 4/28/06.]