WAC 480-107-125
Interconnection costs. (1) Any costs of
interconnection are the responsibility of the owner or
operator of the generating facility entering into a power
contract under this chapter. The utility must assess all
reasonable interconnection and necessary system or network
upgrade costs the utility incurs against a generating facility
on a nondiscriminatory basis.
(2) The owner or operator of the generating facility must
reimburse the utility for any reasonable interconnection costs
the utility may incur. Such reimbursement shall be made, at
the utility's election:
(a) At the time the utility invoices the owner or
operator of the generating facility for interconnection costs
incurred by the utility; or
(b) Over an agreed period of time not greater than the
length of any contract between the utility and the generating
facility.
[Statutory Authority: RCW 80.01.040 and 80.04.160. 06-08-025
(Docket No. UE-030423, General Order No. R-530), §
480-107-125, filed 3/28/06, effective 4/28/06.]