WAC 480-120-105
Company performance standards for
installation or activation of access lines. (1) Except as
provided in subsection (2) of this section, when an
application is made consistent with WAC 480-120-103
(Application for service), the following standards for
installation or activation of service apply:
(a) The local exchange company (LEC) must complete,
within five business days after the order date, or by a later
date requested by a customer, ninety percent of all orders of
up to the initial five access lines received during each
month;
(b) The LEC must complete ninety-nine percent of all
orders of up to the initial five access lines received during
each calendar quarter within ninety days after the order date,
or by a later date requested by a customer; and
(c) The LEC must complete one hundred percent of all
orders for access lines within one hundred eighty days after
the order date, or by a later date requested by a customer.
(2) For purposes of determining the amount of penalties
that shall apply if a LEC fails to complete the percent of
orders required by subsection (1)(a), (b), and (c) of this
section, each order that the LEC fails to complete in excess
of the highest number of uncompleted orders that would not
have triggered a violation shall be a separate violation. For
example, using the ninety-nine percent completion rate under
subsection (1)(b) of this section, if the LEC received one
hundred orders in a quarter, and it completed only ninety-four
of those orders, it would be deemed to have committed five
separate violations, because it completed five less than
required by the section. Violations of subsection (1)(a),
(b), and (c) of this section will be determined separately,
and each order is subject to all three parts.
(3) The timelines set forth in subsection (1)(a) of this
section do not apply when force majeure prevents the
installation or activation of service; and the timelines set
forth in subsection (1) of this section do not apply when
customer-provided special equipment is necessary; when a later
installation or activation is permitted under WAC 480-120-071;
or when the commission has granted an exemption from the
requirement for installation or activation of a particular
order under WAC 480-120-015. These orders will be excluded
from both the numerator and denominator in calculating the
percentage of orders completed.
(4) Unless the commission orders otherwise, subsection
(1)(a) and (b) do not apply to LECs that are competitively
classified under RCW 80.36.320 and do not offer local exchange
service by tariff.
[Statutory Authority: RCW 80.01.040 and 80.04.160. 03-01-065
(Docket No. UT-990146, General Order No. R-507), §
480-120-105, filed 12/12/02, effective 7/1/03.]